Construction of New Multi-Purpose Stadium (click on photo for large view)

August 12, 2014

 
       


August 5, 2014
Roof Steel Placement

     
       


May 22, 2014


May 2, 2014


Main east/west truss

Concrete Pour

Forest of columns

Pouring a floor
 
View of construction site
 
Club level floor
 
Preparing floor for concrete

Truss forming


April 23, 2014


Base of main concourse
 
View from main concourse
 
View from main concourse

First concrete pour - walls added 
 
Field level tunnel
 
Field level tunnel
 
Workers prepping wall
 
Loading dock entrance 


April 17, 2014


Last piece of Metrodome leaves site
     
       


April 11, 2014

 
First concrete pour

 


March 24, 2014

 Support columns

 Dirt removal along retaining wall

  Reinforcement bars

   Footing for main east/west truss

Drilling for column footing

  Drilling for column

  Additional columns

                  Concrete form for columns                                                       

Demolition of the Metrodome                                                                                                                                                                                                                                                                                                                               
March 24, 2014


Vikings Ticket Office


Seat remnant near Section 100

Boulders near Gate F


Sorting metal from the rubble


Looking west

Sorting out metal

Lower level demolition

Along 5th Street


March 18, 2014


 


March 12, 2014


Metal set aside for recycling


Wrecking ball on 5th Street;
rainbow at bottom from dust mitigation spray


High reach excavator on 5th Street

Looking southeast

 


Looking southwest from floor of new stadium site

Looking northwest from field

Looking down Kirby Puckett Place

Retaining wall on 5th Street
     
Cables cut from Dome roof      


Mar 4, 2014

     

 Feb 14-25, 2014

   

 Feb 1, 2014

   

 

Minnesota's New Multi-Use Stadium Exterior Design

   

 

Minnesota's New Multi-Use Stadium Interior Design

 

email contactMSFA 511 11th Avenue South Suite 401 Minneapolis, Minnesota 55415612.332.0386 TTY: 800.627.3529